Training Primavera P6 Professional Fundamental

Training Primavera P6 Professional Fundamental

Training Primavera P6 Professional Fundamental

Description Training Primavera P6 Professional Fundamental

Training Primavera P6 Professional FundamentalPrimavera P6 Professional Fundamental
(3 days training)

Primavera Systems is a brand name under which a range of software packages that collectively form a comprehensive enterprise project portfolio management (EPPM) solution are marketed. Primavera was launched in 1983 by Primavera Systems Inc. and was acquired by Oracle Corporation in 2008.

Primavera P6 EPPM (Enterprise Portfolio Project Management)

Oracle launched  two products callled Primavera P6 i.e. P6 EPPM (Enterprise Portfolio Project Management) and P6 Professional.  The focus of Primavera EPPM software is to allow organizations to effectively manage their programs and projects – regardless of complexity. The software provides end-to-end, real-time visibility of all corporate information to inform portfolio management decisions, determine the correct resources, and ensure that individual project teams have the appropriate skills to complete any given project.

Primavera P6 Professional

Primavera P6 Professional is a Windows client project scheduling application that is installed on a user’s workstation. Much like any other Windows application, it is run from an executable file that resides on the workstation machine.
P6 Professional can be used as a standalone application accessing a locally installed database such as Oracle XE or Microsoft SQL Server Express. It can also access a central database and be used as a multi-user system when data needs to be shared with others.
P6 Professional is typically used in such industries as, Engineering, Construction, Aerospace, Defense, Utilities, Oil and Gas. P6 Professional is the preferred tool for power users such as schedulers and project managers in industries where detailed, fast, accurate scheduling and critical path method are vital elements for project planning, execution and success.

This     training     leads     participants to use Primavera P6 Professional (Primavera’s Windows-based) through the entire project life cycle, from planning to execution. Topics include adding activities, assigning  res sources, and creating a baseline. Participants also gain a thorough background in the concepts of planning and scheduling. It is appropriate for those using P6 Professional either as a stand-alone application or as part of P6 EPPM.

All workshops and instruction stress the three basic elements of project management: schedule, re- sources, and costs. At the end of each day, students apply the con- cepts and functionality they learned in a case study. The course is divided into three sections: Creating a Project; Scheduling the Project; Project Execution and Control.
During the 3-day training our trainer will guide participants how to use Primavera P6 Professional using Hands on Approach and in user friendly  environment.

As considering the complex training material on Primavera P6 Professional Fundamental. We provide training materials that suit to the participant needs.

Goals Training Primavera P6 Professional Fundamental

As following Primavera P6 Professional Fundamental  Participants are able to ;

  1. Understand data structures
  2. Create a project
  3. Create a Work Breakdown Struc- ture
  4. Add activities
  5. View calendars
  6. Create relationships
  7. Schedule the project
  8. Assign constraints
  9. Format schedule data
  10. Define roles and resources
  11. Assign roles
  12. Assign resources
  13. Analyze resources
  14. Optimize the project plan
  15. Execute the project
  16. Create reports

Materials Training Primavera P6 Professional Fundamental

  1. Understanding P6 Data
    •    Describing Enterprise and Project-Specific data
    •    Logging In
    •    Opening an Existing Project
    •    Opening and Customizing Layouts
  2. Enterprise Project Structure
    Describing Components of EPS
  3. Creating a Project
    •    Create a project
    •    Navigating in the Projects Window
    •    Viewing Project Details
  4. Creating a Work Breakdown Structure
    •    Defining a Work Breakdown Struc- ture
    •    Creating the WBS Hierarchy
  5. Adding Activities
    •    Describing an Activity and its Compo- nents
    •    Describing Activity Types
    1)    Adding Activities
    2)    Adding a Notebook Topic
    3)    Adding Steps to an Activity
    4)    Assigning Activity Codes
  6. Creating Relationships
    •    Viewing a Network Logic Diagram
    •    Relationship Types
    •    Creating Relationships
  7. Scheduling
    •    Performing a Forward and Back- ward Pass
    •    Describing Float
  8. Assigning Constraints
    •    Applying an Overall Deadline to a Project
    •    Apply a Constraint to an Activity
  9. Using Reflection Projects
    •    Creating a Reflection Project
    •    Merging Changes
  10. Formatting Schedule Data
    •    Grouping Activities
    •    Sorting
    •    Filtering
  11. Roles and Resources
    •    Describing Roles and Resources
    •    Viewing Dictionaries
  12. Assigning Roles
    •    Assigning Roles to an Activity
    •    Assign Rates on Roles
  13. Assigning Resources
    •    Assigning Resources
    •    Adjusting Budgeted Units/Time
  14. Analyzing Resources
    Displaying the Resource Usage Pro- file
  15. Optimizing the Project Plan
    •    Analyzing Schedule Dates
    •    Shortening a Project Schedule
    •    Analyzing Resource Availability
  16. Baselining the Project Plan
    •    Creating a Baseline Plan
    •    Display Baseline Bars on the Gantt Chart
  17. Project Execution and Control
    •    Describing Methods for Updating the Schedule
    •    Using Progress Spotlight
    •    Statusing Activities
    •    Rescheduling the Project
  18. Reporting Performance
    •    Describing Reporting Method
    •    Running a Schedule Report
    •    Creating a report with the Report Wizard

Participants Training Primavera P6 Professional Fundamental

The participants who want to focuse on Management

 

Metode Training Primavera P6 Professional Fundamental

We provide offline and online training

  • Presentasi
  • Diskusi
  • Case Study
  • Simulasi
  • Evaluasi

Instructor Training Primavera P6 Professional Fundamental

The competent Instructor(s)

 

Schedule Berdiklat Training 2025:

  • Batch 1 : 6 – 7 Januari 2025 || 15 – 16 Januari 2025 || 22 – 23 Januari 2025
  • Batch 2 : 3 – 4 Februari 2025 || 12 – 13 Februari 2025 || 27 – 28 Februari 2025
  • Batch 3 : 5 – 6 Maret 2025 || 10 – 11 Maret 2025 || 19 – 20 Maret 2025
  • Batch 4 : 14 – 15 April 2025 || 23 – 24 April 2025
  • Batch 5 : 5 – 6 Mei 2025 || 14 – 15 Mei 2025 || 26 – 27 Mei 2025
  • Batch 6 : 2 – 3 Juni 2025 || 11 – 12 Juni 2025 || 18 – 19 Juni 2025 || 23 – 24 Juni 2025
  • Batch 7 : 2 – 3 Juli 2025 || 16 – 17 Juli 2025 || 30 – 31 Juli 2025
  • Batch 8 : 4 – 5 Agustus 2025 || 13 – 14 Agustus 2025 || 20 – 21 Agustus 2025 || 29 – 30 Agustus 2025
  • Batch 9 : 3 – 4 September 2025 || 10 – 11 September 2025 || 15 – 16 September 2025 || 24 – 25 September 2025
  • Batch 10 : 8 – 9 Oktober 2025 || 13 – 14 Oktober 2025 || 22 – 23 Oktober 2025
  • Batch 11 : 3 – 4 November 2025 || 12 – 13 November 2025 || 19 – 20 November 2025 || 26 – 27 November 2025
  • Batch 12 : 1 – 2 Desember 2025 || 10 – 11 Desember 2025 || 17 – 18 Desember 2025 || 26 – 27 Desember 2025

If you have any questions, do not hesitate. Please contact us for further information and grab the best price

Investation and Location :

  • Yogyakarta
  • Jakarta
  • Bandung
  • Bali
  • Surabaya

Note(s) :  If you need In house package, the fee can be adjusted to the company budget.

Facilities :

  • Module / Handout
  • Sertifikat
  • FREE Bag or bagpackers (Tas Training)
  • Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
  • 2xCoffe Break & 1 Lunch, Dinner
  • FREE Souvenir Exclusive
  • Training room full AC and Multimedia